90 kw concrete conveying pump
Technology:
- use S-valve to switch the direction, for fine stone concrete conveying
- good sealing S-valve, installed with floating wear resistant ring
- High-quality wear resistant alloy components for long service-life
- high delivery pressure for demand of high-rise and long distance projects
- double-loop open circuit hydraulic system, ensure fast direction switching speed and high efficiency
- air cooling system, without dependence of external water supply
- with re-pumping function to smooth construction of better accessibility
- automatic lubrication system for long service-life
- PLC system to ensure best electrical control performance
- equipped with wired remote controller, easy to operate
specification:
Model No./Concrete pump | HBT60-11SD |
Max. theoretical concrete output(m³/h) | Low pressure 62/high pressure 37 |
Max. theoretical concrete pumping pressure(Mpa) | Low pressure 6.4/high pressure 11 |
Theoretical vertical conveying height(m) | 150 |
Theoretical level transmission distance(m) | 400 |
Allowing the concrete slump(mm) | 100-230 |
Max. Aggregate particles(mm) | 40/45 |
Hopper volume(m³) | 0.6 |
Filling height(mm) | 1400 |
Concrete cylinder diameter × stroke(mm) | Φ180×1200 |
Main oil cylinder diameter(mm) | Φ90 |
Max stroke(mm) | 1000 |
Dynamic brand | electric motor |
Dynamic model | 3-phase asynchronous motor |
Rated power(kw) | 90 |
Fuel consumption(g/h.kw) | N/A |
Hydraulic system | Double circuit opening system |
Brand of main pump | Rexroth |
Max. hydraulic system pressure(Mpa) | 25 |
Hydraulic oil tank volume(L) | 550 |
The radiator cooling type | Air cooling system |
Electric control | PLC |
Concrete tube conveying diameter(mm) | Φ133/Φ150 |
Overall dimension(L×W×H)(mm) | 5440×1882×1965 |
Total weight(kg) | 5200kg |
Hydraulic pump type | Ram pump |
POWER:
Diesel engine adpot the original Huafeng Dongli brand
Motor engine adpot the Huali Shandong brand.
Hydraulic system :
1.Main oil pumps
the main oil pumps apply German Rexroth series and Japanese Kawasaki
2.Hydraulic valves
The hydraulic valves apply the world famous brands.The hydaulic concrete pumps apply specially-made hydraulic valves with a large flow and a little energy loss.This insures the reliability of the system and at the same time saves energy
Mechanical part
The hopper is newly designed and welded with 16Mn steel,which has the high wearing feature and ensure the fluidity and absorbency of concrete.
1.S pipe valves
S tube valves are cast into shape with austenitic manganese steel ,the quick wearing surface is welded with wear resistant material ,have the dual advantages of anti-high pressure and anti-wearing.The inner surface of the pipe transits smoothly and the concret flows freely in the pipe improving the pumping performance further.The splined shaft is made of alloy and the surface is specially treated,its abrasion performance and fatigue strength is enhanced.
2.Glasses plates
.
Glasses plate and cut loop are made of wearable horniness alloy ,they have long service lives
3.Mixing system
The mixing system has special doubel sealing structure ,filled with high pressurelubricating oil,which can prevent the material entering the system and protect the mixing shaft.Feeding with highly wear-resistant and large-angle paddles efficiently boosts the absorption performance.
Electric parts
Main electric elements from Japan's OMRON ,the reliability of the electric-control system is highly improved
Lubricating system
.
Centralized lubrication system adopts progressive distributor which supplies every lubrication point with oil in turn,and the oiling time can be set .so the oiling is accurate and the oil consumption can be saved
Packaging & Delivery
Packaging Details: | 20'container delivery or as requested |
---|
Delivery Detail: | 7days after the advance deposit payment |
---|
Warrantee
The warranty will be one year from the date of shipment. Any detected parts during this period caused by the quality of products will be replaced by seller free of cost (exclude wear and tear parts), improper operation and other manmade reasons are excluded.
Payment terms
40% by T/T as advance payment with 7days after the contract signed, the balance of 60% paid after buyer’s products inspection in seller’s factory or seller send the finished pictures to buyer and 5 days before shipment.
Delivery Schedule
Delivery should be within 20 days from the date of receipt of 40% down payment.
The machine in use
manufacture workshop
Trade show